Scaffold inspectors · Available on Android · Not currently on iPhone

Seven days. One report. Done on the scaffold.

Toeboard turns a scaffold inspection into a signed Schedule 7 report, with photos and a PDF, before you leave the scaffold.

Every scaffold has a 7-day clock and a reminder. Every report holds the eight particulars the regulations ask for, and an issued report cannot be changed.

Tag 0412, birdcage

Rear elevation · next inspection due in 2 days

  • Foundations and base plates Pass
  • Ties Pass
  • Toe boards, level 2 Defect
Example inspection. The scaffold and findings are made up.

The problem

The inspection takes twenty minutes. The report takes the evening: notes on a clipboard, photos in the camera roll, a form retyped at the kitchen table, and a week later you cannot find which scaffold was last checked when.

Toeboard puts the checklist, the photos, the signature and the clock in one place on your phone, and gives you the PDF in minutes.

Who it is for

  • Scaffold inspectors

    The competent person who walks the scaffold, finds the defects and has to put it in writing.

  • Small scaffolding firms

    A handful of scaffolds across several sites, each needing a report every week. One logbook per scaffold, no paper to chase.

  • Site and contracts managers

    The person who has to receive the report within 24 hours and keep it on site. A PDF from the inspector's phone does that.

How it works

One scaffold, one inspection.

  1. Pick the scaffold

    Each site holds the client's name and address, and each scaffold its tag number, type, location and details.

  2. Walk it and tick it off

    Pass, defect or not applicable for each checklist item, with a note and up to four photos on every defect. Record the action taken and any further action.

  3. Sign and send

    Sign on screen, issue the report and share the PDF. The 7-day clock restarts, with a reminder on day 6.

What it does

Everything the report needs, and a clock that keeps you honest.

  • Built to Schedule 7

    Every report holds the eight particulars. Required ones block issue while they are empty, and a report with no matters has to say "None" in words.

  • A checklist for the walk

    Eleven items, from foundations and base plates to ties, boards, guard rails and toe boards, ladders and access, loading, and tags and signage.

  • Defects with photos

    Mark an item as a defect, add a note and up to four photos. Every defect is carried into the matters identified.

  • Not to be used

    Mark the result as not to be used and the PDF is headed in red. The further action is required before you can issue.

  • The 7-day clock

    Each scaffold shows when its next inspection is due. Overdue scaffolds come first, in red, with a reminder on day 6.

  • Frozen once issued

    An issued report cannot be edited, so the record you handed to the client is the record you keep.

  • A logbook per scaffold

    Every report for a scaffold in order, as a logbook PDF you can share.

  • Saves as you type

    Every field is written to your phone at once. Works with no signal.

What the regulations ask for

Regulation 12 of the Work at Height Regulations 2005 covers the inspection of work equipment, including scaffolds. In summary:

  • Inspect after installation or assembly, before first use.
  • Inspect at suitable intervals, and each time something happens that could affect safety, such as high winds or an impact.
  • A working platform from which a person could fall 2 metres or more must have been inspected in position within the previous 7 days.
  • The inspector prepares a written report with the Schedule 7 particulars before the end of the working period, and provides a copy to the person it was done for within 24 hours.
  • The report is kept at the site until the construction work is complete, then at an office for a further three months.

Your data is yours

  • Your reports stay on your phone. There is no account, no server and no sync.
  • No analytics, no advertising and no crash reporting. Nothing you enter reaches Overpass.
  • Your phone's own Android backup keeps your sites, reports and signatures but not photos or PDFs, so use the next option for everything.
  • "Save backup to Files" writes one checked backup file to Google Drive or anywhere your phone can save, and you can restore from it on a new phone.
  • Reminders are local notifications. Purchases are handled entirely by Google Play.
  • Your existing reports stay free to open and export, always, even if you stop paying.

The App Store privacy label for Toeboard is "Data Not Collected", and its Google Play Data safety form declares no data collected or shared.

Read the privacy policy.

Price

Free for one scaffold. A subscription lets you add more.

Free

for one scaffold

£9.99

a month, for more scaffolds

£79.99

a year, for more scaffolds

Questions

What does a Schedule 7 report contain?

Eight particulars: the name and address of the person the inspection was for, the location of the equipment, a description of it, the date and time of the inspection, any matter that could put someone at risk, the action taken, any further action considered necessary, and the name and position of the person making the report. Toeboard asks for each one and will not let you issue the report while a required one is empty.

When does a scaffold have to be inspected?

Under regulation 12 of the Work at Height Regulations 2005, after installation or assembly and before it is used, at suitable intervals, and each time something happens that could affect its safety, such as high winds or an impact. A working platform from which a person could fall 2 metres or more must have been inspected in position within the previous 7 days. Toeboard keeps that 7-day clock for every scaffold.

Does Toeboard make me compliant?

No. Toeboard helps you record an inspection in the form the regulations describe. The checklist is its own aid for finding matters to report, not a legal list, and the PDF says so. The competent person remains responsible for the inspection and the report. The PDF prints the inspection time and the issue time, and says the report was issued within 24 hours only when that is true.

What happens to reports when a scaffold comes down?

Mark the scaffold as dismantled with a date. Its reports stay readable, printable and exportable, and nothing is deleted. The scaffold screen shows a "keep until" date three months after dismantling as a reminder of the duty to keep the report at an office, but nothing is removed on that date.

Do I need an account, and what if I lose my phone?

No account. Reports, photos and signatures are stored on your phone, and an issued report cannot be edited afterwards. Toeboard makes a backup ZIP each day you use it, and "Save backup to Files" writes a fresh, checked one to Google Drive or your phone storage. Restore from it on a new phone. Overpass never receives your data.

Get Toeboard

Questions or feedback: send us a request, or email support@overpass.co.uk. Toeboard is independent software made by Overpass Limited, a small UK software company. It does not give legal advice and does not make anyone compliant. The competent person remains responsible for the inspection and the report.